Brusly Gets Drainage Report With Potential to Reduce Flooding 1.5 Feet
Engineer presents phased solutions for four problem areas after months of analysis BRUSLY — Four months after identifying severe flooding problems on Allene Street, engineer Toby Fruge returned to the town council Monday night with detailed solutions that could reduce peak flood depths by one and a half feet. The Owen
November 19, 2025